Client: Inovyn
Project: North Star VCM Expansion, FTM & Oxy Reactor
Place: Rafnes, Norway
Year: 2019
Delivery: Engineering, prefabrication and installation of steel structures and piping. Mechanical installation
  • share
  • Linkedin
  • Facebook
  • Twitter
North Star VCM Expansion

Project Description

Inovyn at Rafnes has developed a strategic project in order to optimize the activities of the Nordic Hub. The project includes an increase by 70 kt/y of the VCM production capacity of Rafnes in order to saturate downstream PVC plants of Porsgrunn, Stenungsund and Newton Aycliffe.

NLI Scope

FTM (Oxy, Tie Ins, VCM Expansion & TAR): Engineering, fabrication, installation of all piping and structural, and installation of mechanical equipment including purchase of bulk material.

Contact

Knut Sælebakke
Mail: knut.saelebakke@nli.no