Client: Aker Carbon Capture Norway AS
Project: ACC Norcem CCS
Place: Brevik, Norway
Year: Ongoing
Delivery: Hiring of personnel, various disciplines
  • share
  • Linkedin
  • Facebook
  • Twitter
Frame Agreement for Hire of Personnel – Mechanical Installation of Carbon Capture Plant Norcem Brevik

Project Description

The Aker CCS project in Brevik target an annual CO2 capture capacity of 400,000 tons. Most of the energy to capture CO2 is provided by waste heat recovery from existing cement production process. The CO2 capture facility will be integrated into the existing plant. In collaboration with Aker Carbon Capture, Norcem has tested the capture and purification of CO2 at the factory in Brevik. The tests and experiences have been successful where Aker Carbon Capture’s amine technology has been the basis for the project. The construction of the full-scale CCS plant will be completed in 2024.

View video: Carbon Capture at Norcem

View video: The Carbon Capture Process 

NLI Scope

Providing qualified personnel within various disciplines:

  • Project support
  • Site supervision, various disciplines
  • Installation of main equipment at site
  • Site installation and MC of structural, piping and other elements
  • Commissioning assistance
  • Assistance during start-up and performance demonstration phase