Project Description
INEOS ethylene factory (cracker) at Rafnes has been in operation since 1977. In connection with a major E&I Infrastructure project that involves replacing cables, it is necessary to establish new cable bridges.
NLI Scope
Construction and installation of new steel structures, approx. 140 tonnes of steel beams and columns, platforms, walkways, ladders and approx. 10 welding assignments with pipe work in an ethylene factory in full operation.
Contact
Tommy Hansen
Mail: tommy.hansen@nli.no