Client: Apply Emtunga Gothenborg
Project: Clean Agent Supression System
Place: Martin Linge Living Quarter
Year: 2016
Delivery: Design, engineering, procurement and assembly
  • share
  • Linkedin
  • Facebook
  • Twitter
Clean Agent Fire Supression System

Project Description

Apply Emtunga AB (AE) have been assigned the task of building a living quarter (LQ) for Samsung Heavy Industries (SHI). Final customer is Total E&P Norge AS. The LQ is to be installed on the Martin Linge platform outside of Bergen in Norway.
The LQ will be built in modules and consist of approx. 62 modules. The modules will be placed next to each other during construction and will in this way create a LQ. This LQ will be 8 stories high.

NLI Scope

Design, engineering, procurement and assembly of six clean agent systems with cylinders, release valves and instrumentation. Protecting 6 rooms. NORSOK and NFPA 2001 design and fabrication requirement.

Contact

Knut Sælebakke
Mail: knut.saelebakke@nli.no